Question
A galvanized steel shackle requires machining on two different milling machines for operations A and B. a). How many milling machines, type A and B,
A galvanized steel shackle requires machining on two different milling machines for operations A and B.
a). How many milling machines, type A and B, are required to produce 13,000 shackles per monthassuming the company will be operating 5 days a week, 9 hours per day under the machine performancein the table. Tool change and maintenance are done after production:
Operation Standard Time Efficiency Reliability Defect Rate
A 3 mins 95% 95% 3%
B 5 mins 95% 90% 3%
i). Draw the process diagram for this problem
ii). Total milling machines type A
iii). Total milling machines type B
b). Compute the number of machines required if the company is considering two 9 hours shifts (instead ofjust one).
i). Total machines type A
ii). Total machines type B
c). Discuss what will happen to the number of milling machines required if the machines require a 30minutes tool changes and maintenance after a every 500 parts.
Step by Step Solution
There are 3 Steps involved in it
Step: 1
i Draw the process diagram for this problem A simple process diagram for this problem can be found h...Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started