Answered step by step
Verified Expert Solution
Link Copied!
Question
1 Approved Answer

A gas tungsten arc-welding is performed to join two aluminium workpieces through continuous fillet welding. The current and voltage of the arc-welding operation is 300A

A gas tungsten arc-welding is performed to join two aluminium workpieces through continuous fillet welding. The current and voltage of the arc-welding operation is 300A and 20V, respectively. The travel speed of electrode is 10.5 mm/s. The cross-section area of the weldment (perpendicular to the travel direction) is 20 mm2. The unit melting energy for the metal workpiece is 10 J/mm3 and the melting factor is 0.5. Determine (a) the volume rate of metal welded; (b) the rate of heat delivered to the welding operation; (c) the rate of input energy generated by the welding power source (d) The heat transfer factor of this arc-welding operation.

Step by Step Solution

There are 3 Steps involved in it

Step: 1

Solutions Step 1 The solution of the question is g... blur-text-image
Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image_2

Step: 3

blur-text-image_3

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Vector Mechanics For Engineers Statics

Authors: R.C.Hibbeler

7th Edition

978-0072931105, 0072931108

More Books

Students explore these related Mechanical Engineering questions