Question
A gas tungsten arc-welding is performed to join two aluminium workpieces through continuous fillet welding. The current and voltage of the arc-welding operation is 300A
A gas tungsten arc-welding is performed to join two aluminium workpieces through continuous fillet welding. The current and voltage of the arc-welding operation is 300A and 20V, respectively. The travel speed of electrode is 10.5 mm/s. The cross-section area of the weldment (perpendicular to the travel direction) is 20 mm2. The unit melting energy for the metal workpiece is 10 J/mm3 and the melting factor is 0.5. Determine (a) the volume rate of metal welded; (b) the rate of heat delivered to the welding operation; (c) the rate of input energy generated by the welding power source (d) The heat transfer factor of this arc-welding operation.
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Solutions Step 1 The solution of the question is g...Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started