Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

A gas tungsten arc-welding is performed to join two aluminium workpieces through continuous fillet welding. The current and voltage of the arc-welding operation is 300A

A gas tungsten arc-welding is performed to join two aluminium workpieces through continuous fillet welding. The current and voltage of the arc-welding operation is 300A and 20V, respectively. The travel speed of electrode is 10.5 mm/s. The cross-section area of the weldment (perpendicular to the travel direction) is 20 mm2. The unit melting energy for the metal workpiece is 10 J/mm3 and the melting factor is 0.5. Determine (a) the volume rate of metal welded; (b) the rate of heat delivered to the welding operation; (c) the rate of input energy generated by the welding power source (d) The heat transfer factor of this arc-welding operation.

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access with AI-Powered Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Statistics For Business And Economics

Authors: James T. McClave, P. George Benson, Terry T Sincich

12th Edition

9780321826237

Students also viewed these Mechanical Engineering questions

Question

Documentation of the appraisal activities

Answered: 1 week ago

Question

Personal knowledge of and contact with each appraised individual

Answered: 1 week ago

Question

A rating instrument linked to job duties and responsibilities

Answered: 1 week ago