Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

A Jack-in-the-box toy includes two components, the jester (part A) and the box (part B). The following flowchart demonstrates its manufacturing process. Production of Part

image text in transcribed
image text in transcribed
A Jack-in-the-box toy includes two components, the jester (part A) and the box (part B). The following flowchart demonstrates its manufacturing process. Production of Part A A.1 A.2 C.1 C.2 B.1 B.2 B.3 Production of Part B Final assembly It takes two steps, A.1 and A.2, to make part A, performed by two dedicated workstations, respectively: A.1 has a process time of 5 minutes; A.2 has a process time of 8 minutes. It takes three steps, B.1, B.2, and B.3, to make part B, performed by three dedicated operators, respectively: B.1 has a process time of 5 minutes; B.2 has a process time of 8 minutes; B.3 has a process time of 3 minutes. . After both parts are produced, they will be combined together to form the final It takes two steps, A.1 and A.2, to make part A, performed by two dedicated workstations, respectively: A.1 has a process time of 5 minutes; A.2 has a process time of 8 minutes. sa It takes three steps, B.1, B.2, and B.3, to make part B, performed by three dedicated operators, respectively: B.1 has a process time of 5 minutes; B.2 has a process time of 8 minutes; B.3 has a process time of 3 minutes. After both parts are produced, they will be combined together to form the final product through the final assembly operations. This step takes 11 minutes and is performed by either of the two parallel workstations, C.1 and C.2. Note that C.1 and C.2 perform identical operations and each unit of product requires just one of them for 11 minutes. What is the process cycle time of this manufacturing process (in minutes)? Keep 1 decimal place if your answer is not a whole number Your Answer: Answer A Jack-in-the-box toy includes two components, the jester (part A) and the box (part B). The following flowchart demonstrates its manufacturing process. Production of Part A A.1 A.2 C.1 C.2 B.1 B.2 B.3 Production of Part B Final assembly It takes two steps, A.1 and A.2, to make part A, performed by two dedicated workstations, respectively: A.1 has a process time of 5 minutes; A.2 has a process time of 8 minutes. It takes three steps, B.1, B.2, and B.3, to make part B, performed by three dedicated operators, respectively: B.1 has a process time of 5 minutes; B.2 has a process time of 8 minutes; B.3 has a process time of 3 minutes. . After both parts are produced, they will be combined together to form the final It takes two steps, A.1 and A.2, to make part A, performed by two dedicated workstations, respectively: A.1 has a process time of 5 minutes; A.2 has a process time of 8 minutes. sa It takes three steps, B.1, B.2, and B.3, to make part B, performed by three dedicated operators, respectively: B.1 has a process time of 5 minutes; B.2 has a process time of 8 minutes; B.3 has a process time of 3 minutes. After both parts are produced, they will be combined together to form the final product through the final assembly operations. This step takes 11 minutes and is performed by either of the two parallel workstations, C.1 and C.2. Note that C.1 and C.2 perform identical operations and each unit of product requires just one of them for 11 minutes. What is the process cycle time of this manufacturing process (in minutes)? Keep 1 decimal place if your answer is not a whole number Your

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Day Trading Strategies And Risk Management

Authors: Richard N. Williams

1st Edition

979-8863610528

More Books