Answered step by step
Verified Expert Solution
Question
1 Approved Answer
A JIT/lean system uses kanban cards to authorize production and movement of materials. In one portion of the system, a work centre uses an average
A JIT/lean system uses kanban cards to authorize production and movement of materials. In one portion of the system, a work centre uses an average of 108 pieces of a part per hour. The manager has assigned a safety factor of 0.50 . Standard containers are designed to hold seven dozen pieces each. The cycle time for a kanban is 123 minutes. How many kanbans are needed? (Round the final answer to the nearest whole number.) Number of Kanbans Calculate the takt time for a system where the total time per shift is 480 minutes, there is one shift, and workers are given two 15 minute breaks and 55 minutes for lunch. Daily demand is 302 units. (Round the final answer to 2 decimal places.) Takt time minutes per unit
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started