Question
A limestone formation with an average depth of 25 ft is exposed over the full 450-ft width and 15,000-ft length of a highway cut. The
A limestone formation with an average depth of 25 ft is exposed over the full 450-ft width and 15,000-ft length of a highway cut. The rock has a seismic velocity of 5,000 fps. The contractor proposes to loosen this rock with 3 D9R dozers each with a single shank ripper. The job conditions relative to lamination and other rock characteristics are average, or midway between adverse and ideal. A 45-min production hour is appropriate. 0&O costs for each D9R in this ripping application are $160/hr. The operator\'s wage is $25/hr. What is the estimated unit cost to rip this rock? What will be the total cost of the work, and how many hours will the project require?
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started