Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

A limestone formation with an average depth of 25 ft is exposed over the full 450-ft width and 15,000-ft length of a highway cut. The

A limestone formation with an average depth of 25 ft is exposed over the full 450-ft width and 15,000-ft length of a highway cut. The rock has a seismic velocity of 5,000 fps. The contractor proposes to loosen this rock with 3 D9R dozers each with a single shank ripper. The job conditions relative to lamination and other rock characteristics are average, or midway between adverse and ideal. A 45-min production hour is appropriate. 0&O costs for each D9R in this ripping application are $160/hr. The operator\'s wage is $25/hr. What is the estimated unit cost to rip this rock? What will be the total cost of the work, and how many hours will the project require?

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Design Operation And Evaluation Of Mobile Communications

Authors: Gavriel Salvendy ,June Wei

1st Edition

3030770249, 978-3030770242

More Books

Students also viewed these Programming questions