Answered step by step
Verified Expert Solution
Question
1 Approved Answer
A local manufacturing company at Trinidad primarily manufactures four machine components and exports the same to an aerospace firm. Each of the products passes through
A local manufacturing company at Trinidad primarily manufactures four machine components and exports the same to an aerospace firm. Each of the products passes through four departments in their manufacturing process before they are shipped: turning, drilling, assembly, and inspection. The time requirement for processing the products in each department (in hours) for each unit produced is given in table below. Profit per unit for each product is known to you as production manager in the company. Product Department Turning Drilling Assembly Inspection Unit Profit XJ102 0.5 3 2 0.5 XM507 1.5 1 4 1.0 TR19 1.5 2 1 0.5 BP 188 1.0 3 2 0.5 The production time available in each department each month and minimum monthly production requirement to fulfil the contract are as follows: Capacity (in hours) 1500 Minimum Production Level 150 Department Turning Drilling Assembly Inspection 1700 Product XJ102 XM507 TR19 BP 188 2600 100 300 400 1200 As a production manager, you have responsibility to specify production levels for each product for coming month. Formulate the linear programming model for the case. (6 Marks)
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started