A maintenance workshop wants to add a new welding station. So the welding manager asked the simulation engineer to provide him with how much space
A maintenance workshop wants to add a new welding station. So the welding manager asked the simulation engineer to provide him with how much space should they allocate. What measures can the simulation engineer use to provide information about the space needed? And why (what do they mean?)
Step by Step Solution
There are 3 Steps involved in it
Step: 1
To determine the appropriate space allocation for the new welding station the simulation engineer can use the following measures 1 Throughput Throughp...Get Instant Access to Expert-Tailored Solutions