A manual assembly line is to be designed to make a small consumer product. The work elements, their times, and precedence constraints are given in
A manual assembly line is to be designed to make a small consumer product. The work
elements, their times, and precedence constraints are given in the table below. The workers
will operate the line for min per day and must produce products per day. A
mechanized belt, moving at a speed of mmin will transport the products between
stations. Because of the variability in the time required to perform the assembly operations,
it has been determined that the tolerance time should be times the cycle time of the line.
Construct the precedence diagram
Determine the ideal minimum number of workers
Use the Largest Candidate Rule method to balance the line.
Compute the balance delay for your solution in tableElementTime Preceded by:Element,Time Preceded by:min,min,min,min,min,min,min,min,min,min,
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started