Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

A manufacturer makes two types of rubber, Butadieneand Polyisoprene.The plant has two machines, Machine-1 and Machine-2, which are used to make the rubber strips. Manufacturing

A manufacturer makes two types of rubber, Butadieneand Polyisoprene.The plant has two machines, Machine-1 and Machine-2, which are used to make the rubber strips. Manufacturing one strip of Butadiene requires 2.75 hours on Machine-1 and 3 hours on Machine-2.Processing one strip of Polyisoprene, takes 3.5 hours on Machine-1 and 4 hours on Machine-2.Machine-1 is available 180 hours per month, and Machine-2 is available 200 hours per month. Formulate an all-integer mathematical model that will determine how many units of each type of rubber should be produced to maximize profits if the profit contributions of Butadiene and Polyisoprene are $20 and $26, respectively.If B = number of units of Butadieneproduced and P = number of units of Polyisopreneproduced, which of the following constraints should be included in the model?

image text in transcribed
\f

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Fundamentals Of Applied Probability And Random Processes

Authors: Oliver Ibe

1st Edition

0128010355, 9780128010358

More Books

Students also viewed these Mathematics questions

Question

Define lying.

Answered: 1 week ago