A new highway is to be constructed. Design A calls for a concrete pavement costing $85 per foot with a 16 -year life; three paved

image text in transcribed

A new highway is to be constructed. Design A calls for a concrete pavement costing $85 per foot with a 16 -year life; three paved ditches costing $3 per foot each; and two box culverts every mile, each costing $9,000 and having a 16 -year life. Annual maintenance will cost $1,800 per mile; the culverts must be cleaned every four years at a cost of $450 each per mile. Design B calls for a bituminous pavement costing $55 per foot with a 8-year life; three sodded ditches costing $1.45 per foot each; and three pipe culverts every mile, each costing $2,100 and having a 8-year life. The replacement culverts will cost $2,400 each. Annual maintenance will cost $2,600 per mile; the culverts must be cleaned yearly at a cost of $225 each per mile; and the annual ditch maintenance will cost $1.55 per foot per ditch. Compare the two designs on the basis of equivalent worth per mile for a 16-year period. Find the most economical design on the basis of AW and PW if the MARR is 12% per year. Click the icon to view the interest and annuity table for discrete compounding when the MARR is 12% per year. The AW value for Design A is $/mi. (Round to the nearest hundreds.) The PW value for Design A is $ Imi. (Round to the nearest hundreds.) The AW value for Design B is $ Imi. (Round to the nearest hundreds.) The PW value for Design B is $/ mi. (Round to the nearest hundreds.) The most economical design on the basis of AW and PW is A new highway is to be constructed. Design A calls for a concrete pavement costing $85 per foot with a 16 -year life; three paved ditches costing $3 per foot each; and two box culverts every mile, each costing $9,000 and having a 16 -year life. Annual maintenance will cost $1,800 per mile; the culverts must be cleaned every four years at a cost of $450 each per mile. Design B calls for a bituminous pavement costing $55 per foot with a 8-year life; three sodded ditches costing $1.45 per foot each; and three pipe culverts every mile, each costing $2,100 and having a 8-year life. The replacement culverts will cost $2,400 each. Annual maintenance will cost $2,600 per mile; the culverts must be cleaned yearly at a cost of $225 each per mile; and the annual ditch maintenance will cost $1.55 per foot per ditch. Compare the two designs on the basis of equivalent worth per mile for a 16-year period. Find the most economical design on the basis of AW and PW if the MARR is 12% per year. Click the icon to view the interest and annuity table for discrete compounding when the MARR is 12% per year. The AW value for Design A is $/mi. (Round to the nearest hundreds.) The PW value for Design A is $ Imi. (Round to the nearest hundreds.) The AW value for Design B is $ Imi. (Round to the nearest hundreds.) The PW value for Design B is $/ mi. (Round to the nearest hundreds.) The most economical design on the basis of AW and PW is

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Ebay Tips And Tricks To Increase Your Ebay Sales

Authors: Jessica Wilson

1st Edition

1774854015, 978-1774854013

More Books

Students also viewed these Finance questions