Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

A newly constructed food processing plant is scheduled to begin discharging a waste water with B O D L = 1 0 0 m g

A newly constructed food processing plant is scheduled to begin discharging a waste water with BODL=100mgL into an otherwise pristine river (i.e.,BODL of river =0 before start of the wastewater input). Assume that the river flow, Qr, is 7.5107m3s and the wastewater, Qw, flow will be 7.5106m3s. Assume that the expected flow velocity of the combined flows in the river is 1km? day and that, as a first approximation, dispersion in the river can be ignored. If the BODL obeys first order kinetics with a decay rate of 0.2? day, calculate the expected BODL concentration downstream at two distances: 1km and 5km, for three different times: 12 day, 2 days, and 10 days after the onset of the wastewater discharge.
image text in transcribed

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image_2

Step: 3

blur-text-image_3

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Organic Chemistry

Authors: Francis A. Carey

4th edition

0072905018, 978-0072905014

More Books

Students also viewed these Chemistry questions

Question

Define exchange rate risk and political risk.

Answered: 1 week ago