A piping system repair must be made to a vertical piping system. The pipe is 60 feet long prior to its turn to a horizontal
A piping system repair must be made to a vertical piping system. The pipe is 60 feet long prior to its turn to a horizontal direction. There is a repair that must be done at 35 feet above the floor. The pipe is filled with a liquid having the same properties as water. At the location of the pipe repair, what is the pressure of the fluid? (Note, the height of the cylinder is the length of the pipe minus the height of the repair from the floor).