Answered step by step
Verified Expert Solution
Question
1 Approved Answer
A power generating station has a maximum demand of ( 10,000 mathrm{~kW} ) and the daily load on the station is as follows: (a) Draw
A power generating station has a maximum demand of \( 10,000 \mathrm{~kW} \) and the daily load on the station is as follows: (a) Draw the load curve and the load duration curve. (b) Choose the size and number of generating units. (c) Draw up the operating schedule of the units. (d) What reserve plant would be necessary? (e) Calculate the load factor, plant capacity factor and plant use factor of the station. [Ans. (b) Three units of 5000, 2500 and \( 2500 \mathrm{~kW} \) capacity, (d) \( 5000 \mathrm{~kW} \), (e) \( 55 \%, 36.66 \%, 86.5 \% \) ]
13 A power generating station has a maximum demand of 10,000kW and the daily load on the station is as follows: (a) Draw the load curve and the load duration curve. (b) Choose the size and number of generating units. (c) Draw up the operating schedule of the units. (d) What reserve plant would be necessary? (e) Calculate the load factor, plant capacity factor and plant use factor of the station. [Ans. (b) Three units of 5000,2500 and 2500kW capacity, (d) 5000kW, (e) 55%,36.66%,86.5%] Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started