A power generating station has a maximum demand of ( 10,000 mathrm{~kW} ) and the daily load on the station is as follows: (a) Draw

A power generating station has a maximum demand of \( 10,000 \mathrm{~kW} \) and the daily load on the station is as follows: (a) Draw the load curve and the load duration curve. (b) Choose the size and number of generating units. (c) Draw up the operating schedule of the units. (d) What reserve plant would be necessary? (e) Calculate the load factor, plant capacity factor and plant use factor of the station. [Ans. (b) Three units of 5000, 2500 and \( 2500 \mathrm{~kW} \) capacity, (d) \( 5000 \mathrm{~kW} \), (e) \( 55 \%, 36.66 \%, 86.5 \% \) ]
image text in transcribed
13 A power generating station has a maximum demand of 10,000kW and the daily load on the station is as follows: (a) Draw the load curve and the load duration curve. (b) Choose the size and number of generating units. (c) Draw up the operating schedule of the units. (d) What reserve plant would be necessary? (e) Calculate the load factor, plant capacity factor and plant use factor of the station. [Ans. (b) Three units of 5000,2500 and 2500kW capacity, (d) 5000kW, (e) 55%,36.66%,86.5%]

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Heat Transfer

Authors: Jack Holman

10th edition

73529362, 978-0073529363

More Books

Students also viewed these Mechanical Engineering questions

Question

How autonomous should the target be left after the merger deal?

Answered: 1 week ago