A production line is to be designed for a job with four tasks. The task times are 3.4 minutes, 1.6 minutes, 1 minutes and 2
A production line is to be designed for a job with four tasks. The task times are 3.4 minutes, 1.6 minutes, 1 minutes and 2 minutes and there are 8 productive hours of work per day, the number of units required per day equal 40. the cycle time is a. 0:2 b. 5 c. 308 0.133 e. 12