A project consists of five activities listed below. The project network is shown for the activities. The critical path is B-C-E and the expected completion
- A project consists of five activities listed below. The project network is shown for the activities. The critical path is B-C-E and the expected completion time is 8.
Optimistic | Most Probable | Pessimistic | |
Activity | Time (hr) | Time (hr) | Time (hr) |
A Floor sanding | 3 | 4 | 5 |
B Paint mixing | 0.5 | 1 | 1.5 |
C Ceiling painting | 1 | 5.5 | 7 |
D Wall painting | 1 | 2 | 9 |
E Floor buffing | 1 | 2 | 3 |