A roller coaster with two trains, each with 18 seats, is scheduled to operate with only half of its seats available from 10 am to
A roller coaster with two trains, each with 18 seats, is scheduled to operate with only half of its seats available from 10 am to 9pm. Assume each ride requires 20 minutes including loading and unloading. a) Select the correct whole number for the daily design capacity in riders per day. b) Select the correct whole number for the daily effective capacity in riders per day