a) Sawing is the bottleneck. b) The bottleneck time is 30.00 minutes per unit (round your response to two decimal places). c) The throughput time
a) Sawing is the bottleneck. b) The bottleneck time is 30.00 minutes per unit (round your response to two decimal places). c) The throughput time of the overall system is 151.55 minutes (round your response to two decimal places). d) If the firm operates 11 hours per day, 20 days per month, the monthly capacity of the manufacturing process is 440 units (enter your response as a whole number). A production process at Kenneth Day Manufacturing is shown in the figure below. The drilling operation occurs separately from, and simultaneously with, the sawing and sanding, which are independent sequential operations. A product needs to go through only one of the three assembly operations (the operations are in parallel)
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started