A site development contractor is excacvating in fine silty sand. Because of the cut location and lack of drainage, surface water has drained into the

A site development contractor is excacvating in fine silty sand. Because of the cut location and lack of drainage, surface water has drained into the cut, leaving the material very wet. Rubber tired scrapers are hauling material from the cut to an adjacent fill. The material is being placed in the fill in 8-10 inch lifts and compacted by a heavy sheepsfoot roller towed by a crawler tractor. The required compaction (95% of Proctor density) is not being achieved. The sheepsfoot roller is not "walking out" and the scraper tires are causing deep rutting and displacement of the fill material as they travel over it. What is causing the compaction problem? What would you suggest to the contractor or geotechnical inspector to improve the compaction process, and why? Please suggest two ideas with reasons

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Research Methods For Business And Social Science Students

Authors: John Adams

2nd Edition

8132113667, 9788132113669

More Books

Students also viewed these General Management questions

Question

discuss ways of measuring sickness absence and sickness presence;

Answered: 1 week ago