Answered step by step
Verified Expert Solution
Question
1 Approved Answer
A six-station dial-indexing machine is designed to perform four assembly operations at stations 2 through 5 after a base part has been manually loaded
A six-station dial-indexing machine is designed to perform four assembly operations at stations 2 through 5 after a base part has been manually loaded at station 1. Station 6 is the unload station. At each of the four assembly stations, a hopper-feeder is used to deliver components to a selector device that separates components that are improperly oriented and drops them back into the hopper. The system was designed with the operating parameters for stations 2 through 5 as given in the table below. It takes 2 sec to index the dial from one station to the next. When a component jams, it takes an average of 2 min to release the jam and restart the system. The line manager says the production system was designed to produce at a certain hourly rate, which considers the jams resulting from defective components. However, the actual delivery of finished assemblies is far below that designed production rate. Station Assembly time Feed rate Selector 9 m f 2 6 sec 25/min 0.25 0.01 1.0 3 9 sec 22/min 0.55 0.003 0.7 4 8 sec 38/min 0.3 0.02 1.0 5 5 sec 11/min 1.0 0.01 0.9
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started