A storage tank is purged continuously with a stream of nitrogen. The purge stream leaving the tank is saturated with the product stored in the
A storage tank is purged continuously with a stream of nitrogen. The purge stream leaving the
tank is saturated with the product stored in the tank. A major part of the product lost in the
purge could be recovered by installing a scrubbing tower to absorb the product in a solvent.
The solution from the tower could be fed to a stage in the production process, and the product
and solvent recovered without significant additional cost. A preliminary design of the purge
recovery system has been made. It would consist of the following:
A small tower diameter, high, packed with ceramic saddles, packed
height
A small storage tank for the solution, capacity
The necessary pipe work, pump, and instrumentation
All the equipment can be constructed from carbon steel.
Using the following data, evaluate how long it would take for the cost savings to pay for
the capital cost of installing the recovery system:
Cost of product $ per
Cost of solvent $ per lb
Additional solvent makeup
Current loss of product
Anticipated recovery of product
Additional utility costs, negligible
Other operating costs will be insignificant.
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started