A student wants to schedule a project using PERT. The network diagram is drawn in AOA format (activity on arrow). She has determined the following
A student wants to schedule a project using PERT. The network diagram is drawn in AOA format (activity on arrow). She has determined the following activities, precedence relationships and time estimates in days for the project: 1-a. Name all potential paths and corresponding durations