A supplier to Toyota stamps out parts using a press. Changing a part type requires the supplier to change a die on the press. This
A supplier to Toyota stamps out parts using a press. Changing a part type requires the supplier to change a die on the press. This changeover currently takes two hours. The supplier estimates that each hour spent on the changeover costs $250. Demand for parts is 1,000 per month. Each part costs the supplier $25, and the supplier incurs an annual holding cost of 25%.
3. Determine the optimal production batch size for the supplier