Answered step by step
Verified Expert Solution
Question
1 Approved Answer
A table is assembled using three components, as shown in the following product structure tree. The company that makes the table wants to ship 8
A table is assembled using three components, as shown in the following product structure tree. The company that makes the table wants to ship units at the beginning of day units at the beginning of day and units at the beginning of day Receipts of wood sections are scheduled at the beginning of day There are legs on hand. An additional percent of the order size on legs is added for scrap allowance. There are braces on hand. Lead time in days for all items is a function of each order quantity and is shown below.
Order Quantity Lead Time days
Prepare the material requirements plan using lotforlot ordering. Do not leave any empty spaces; input a wherever it is required.
Production Schedule
Day Beg. Inv.
Quantity
Table Variable LT Beg. Inv.
Gross requirements
Scheduled receipts
Projected on hand
Net requirements
Plannedorder receipts
Plannedorder releases
Wood Sections Beg. Inv.
Gross requirements
Scheduled receipts
Projected on hand
Net requirements
Plannedorder receipts
Plannedorder releases
Braces Beg. Inv.
Gross requirements
Scheduled receipts
Projected on hand
Net requirements
Plannedorder receipts
Plannedorder releases
Legs
extra safety stock Beg. Inv.
Gross requirements
Scheduled receipts
Projected on hand
Net requirements
Plannedorder receipts
Plannedorder releases
Note that lead time is a function of lot size.
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started