Question

1 Approved Answer

a) The capacity factor of a hydroelectric power plant is 0.5. Its capital cost and variable cost are $2000/kW and $0.005/kWh, respectively. Estimate the

image text in transcribed

a) The capacity factor of a hydroelectric power plant is 0.5. Its capital cost and variable cost are $2000/kW and $0.005/kWh, respectively. Estimate the cost of electricity for this power plant if the fixed charge rate is 0.2/yr. (4 marks) b) Refer to the following load duration curve for a utility, and find the average capacity factor if the utility has 200 MW of base-load wind power plants. (4 marks) Demand (MW) 1000 900 800 700 600 500 400 300 $760 hr/yr 200 100 0 0 1000 2000 3000 4000 5000 6000 7000 8000 9000 Hours/year Figure C1: Load duration curve for a utility [Source: Renewable and Efficient Electric Power Systems by Gilbert M. Masters, John Willey, 2004]. c) Cables carrying higher voltages must be spaced further apart from each other and from the ground. Is this statement correct? If yes, why? (2 marks)

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Modern Quantum Mechanics

Authors: J.J Sakurai

Revised Edition

9781108499996, 201539292, 978-0201539295

More Books

Students also viewed these Mechanical Engineering questions

Question

What is learning?

Answered: 1 week ago