Answered step by step
Verified Expert Solution
Question
1 Approved Answer
A time study was conducted on a job that contains four elements. The observed tImes and performance ratings for six cycles are shown in the
A time study was conducted on a job that contains four elements. The observed tImes and performance ratings for six cycles are shown in the following table. Click here for the Excel Data Flle a. Determine the average cycle time for each element. (Round your answers to 3 decimal places.) b. FInd the normal time for each element. (Round your answers to 3 decimal places.) c. Assuming an allowance factor of 15 percent of job time, compute the standard time for this job. (Round your answers to 3 decimal places.) A time study was conducted on a job that contains four elements. The observed tImes and performance ratings for six cycles are shown in the following table. Click here for the Excel Data Flle a. Determine the average cycle time for each element. (Round your answers to 3 decimal places.) b. FInd the normal time for each element. (Round your answers to 3 decimal places.) c. Assuming an allowance factor of 15 percent of job time, compute the standard time for this job. (Round your answers to 3 decimal places.)
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started