Question
A warehouse, just outside of Montreal, gets a daily shipment of a USB connector product. The daily demand of this product is 2200. The products
A warehouse, just outside of Montreal, gets a daily shipment of a USB connector product. The daily demand of this product is 2200. The products are first placed in storage (waiting stage) at the entrance of the warehouse where on average there are 320 products. A Receiving clerk picks the products from storage and verifies them (assure quality stage). It takes the clerk 0.01 days to verify each product. Then the products are sorted and packaged (sorting stage) into three streams: Ottawa (20% of products), Laval (30% of products), and Montreal (50% of products). On average, there are 380 products being sorted. After, three shipping stations load the products into trucks heading to each location respectively (Montreal, Laval, and Ottawa). The loading stage takes 0.004, 0.01 days, and 0.08 days for the destination of Montreal, Laval, and Ottawa respectively for each product (last stage of process).On Average, how many hours does a product spend in the warehouse (assuming 8 hours in a day)?
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started