Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

A well has been tested at a rate of 202 STB/D during a three-day period. Stabilised wellbore flowing pressure measured 3248 psia. The wellbore was

A well has been tested at a rate of 202 STB/D during a three-day period. Stabilised wellbore flowing pressure measured 3248 psia. The wellbore was previously tested with a multi-rate sequence which indicated average reservoir pressure is 4000 psia and resulted in below IPR equation: q0 = 0.000828[PR 2 Pwf 2 ] 0.8 Use Excel Sheet MS Office to: a) Plot IPR curve for this well. b) Plot TPR curve for this well using the gradient curves. Assume = 200 , = 600 /, = 8000 , = 3.5 . c) Determine the rate of natural flow of the well. Provide the plot you have used to perform the Nodal Analysis.

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

More Books

Students also viewed these Accounting questions

Question

What is ethnocentrism, and how can it be reduced?

Answered: 1 week ago

Question

Stages of a Relationship?

Answered: 1 week ago