Question
ABC Co makes product X by mixing together two ingredients, A and B. The standard cost card for one unit of X is as follows:
ABC Co makes product X by mixing together two ingredients, A and B. The standard cost card for one unit of X is as follows:
Material | Kgs per unit | $ per kg | $ per unit |
A | 2 | 1.50 | 3.00 |
B | 5 | 1.75 | 8.75 |
11.75 |
The budgeted output for the March was 60 units. After one month of production, 50 units of X were produced from 110 kg of A and 225 kg of B.
1)Calculate the material mix variance
2)Calculate the materials usage variance.
3)Calculate the material yield variance
4)Which of the following factors would result in an adverse material usage variance in ABC Co?
(1) Using an inferior quality of material A or B
(2) Making changes to the production process
(3) Introducing increased quality controls resulting in more items of Product X being rejected.
5)
Which of the following factors would result in a material mix variance in ABC Co?
An inferior quality of material A or B is used
The cost of materials A or B changes
The selling price of Product X changes
The production manager in Ash Co deviates from the standard mix
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started