able to operate at full capacity and are currently incurring losses due to a decision to not lay off any permanent staff members. A Request
able to operate at full capacity and are currently incurring losses due to a decision to not lay off any permanent staff members.
A Request to Bid has been sent by WaterBlue, an NGO, to a number of environmental consultants to undertake an analysis of a river pollution spill by Smokestack Ltd and compile a report for public comment. WaterBlue has made it clear that being an NGO, they cannot afford more than R250 000, but given the public scrutiny, they expect a comprehensive report based on full testing. Competition for the bid is expected to be fierce as this will be a high-profile case.
A preliminary costing has been undertaken and the firms lead consultant has indicated that it is not worthwhile to proceed. Even though it will give us a good profile, it will just compound our losses. In addition, the Internal Consultant has a short-term contract of 20 hours for CapeBees at our full fee of R2,500 per hour, which would have to run concurrently with WaterBlue and cannot be delayed or postponed.
The analysis has been prepared as follows:
Note | ESG: Request to Bid fee for NGO | |||
1 | Internal Consultant | 100 hours @ R1,000 per hour | R100,000 |
|
2 | Outside consultant | 20 hours @ R1,500 per hour | R30,000 |
|
3 | Recovery on laboratory fixed cost | 20 hours @ R500 per hour | R10,000 |
|
4 | Acquisition of safety wear | 2 consultants @ R15,000 each | R30,000 |
|
5 | Boat hire | R5,000 per day for 5 days | R25,000 |
|
6 | Chemicals | Acquired in 2019, still suitable | R40,000 |
|
7 | Variable overheads | 120 hours @ R50 per hour | R6,000 |
|
8 | Fixed Overheads | 120 hours @ R800 per hour | R96,000 |
|
| Total |
| R337,000 |
|
9 | Normal Mark-Up | 25% | R84,250 |
|
| ESG Bid Price |
| R421,250 |
|
| Required Bid Price |
| R250,000 |
|
| Loss |
| R171,250 |
|
Notes to the above:
- The Internal Consultant is a permanent full-time staff member who continues to earn full salary. The short contract for CapeBees (20 hours at R2,500 per hour) is not included in the above analysis.
- The outside consultant is an independent, self-employed consultant who brings a specialist skill set required for the pollution spill project.
- ESG has its own on-site laboratory, which was built five years ago. Every project which requires its services is charged a fixed recovery rate.
- As the pollution spill is potentially hazardous, safety wear will be required for both consultants. These will be disposed of after the pollution spill has been analysed.
- ESG will need to hire a boat to gather samples.
- The chemicals were acquired in 2019 for R40,000. It was deemed fortuitous that this project would proceed as ESG has no other use for them. An offer has been made by another company to acquire the chemicals for R5,000.
- Variable overheads are incurred at a chargeable rate of R50 per hour. The 120 hours comprises the total time of both the Internal and External Consultant.
- Fixed overheads are incurred at a chargeable rate of R800 per hour. The 120 hours comprises the total time of both the Internal and External Consultant. The fixed overhead rate is calculated according to normal activity and hence includes all consultant activities irrespective of whether they are Internal or External.
- The mark-up of 25% is deemed to be a reasonable return, given that it is normally 40%.
QUESTIONS:
Q1:
Should ESG (Pty) Ltd accept Smokestack Ltd's offer or not? Fully justify your answer.
Q2:
How would your decision change if ESG (Pty) Ltd was working at full capacity. [Note no supporting calculation is required, just an explanation]
Q3:
Ignoring the Smokestack Ltd scenario, outline 3 Qualitative Factors ESG (Pty) Ltd should take into consideration, should it proceed to undertake the WaterBlue project at the price of R250 000?
Q4:
Special Order Analysis for WaterBlue Bid. An Excel Spreadsheet has been provided to you. It has been been pre-prepared with all the cost items. Input the relevant values to determine the minimum bid price that should be charged. If you deem a cost item to be NOT relevant, simply add a 0.
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started