Question
ACC 122 - 801 Online Managerial Cost Accounting Group Project - Bill of Material Costing The purpose of this exercise is to familiarize you with
ACC 122 - 801 Online
Managerial Cost Accounting
Group Project - Bill of Material Costing
The purpose of this exercise is to familiarize you with costing in a manufacturing environment. The tool often utilized is the cost indented bill of material or BOM to develop a product cost.
The bill of material is developed by design engineering and is structured to reflect how the product is to be assembled or manufactured.
Material cost may be obtained from a purchase history or price quotations.
Industrial engineering determines the labor standard or time required to make an assembly from time or methods studies. For example, .005 hours to assemble level 9 parts to make assembly 8 in the following bill of material. Wage rates may be obtained from collective bargaining agreements or from payroll records. A wage rate of $15 per hour multiplied by the assembly hours of .005 yields a labor cost of 7.5 cents of assembly labor.
Overhead is often a function of labor or utilizes labor as a driver. For example, an overhead rate may be 130% of labor cost or labor hours worked. The overhead calculation for the previous example would be 7.5 cents multiplied by 130% or overhead per assembly of 9.75 cents. Other drivers may be used for overhead calculations such as machine hours. Overhead rates are determined during the annual budgeting process.
Parts and assemblies are indented to show which parts are combined to make an assembly.
LevelSourcePart NumberMaterialLaborOverheadTotal
7MA0XXXXXXXX
8MA1XXXXXXXX
9PB2XX
9P B3XX
8MA2XXXXXXXX
9PB4XX
9PB5XX
The (M) signifies a manufactured part. The (P) signifies a purchased part. The cost of level 9 parts are assembled to make level 8 cost. The level 8 costs are combined to make level 7. Levels 7 and 8 are manufactured parts. This is referred to as rolling the cost. You always start at the bottom and develop your cost to level 0. Once you reach level 0 costing for this product is complete.
Please review the previous product structure. If you have any questions do not hesitate to contact me.
Working in a cost accounting environment you will probably use costing software that will roll the product cost for you. Your responsibility is to make sure all part cost and labor rates are in the respective cost files. Please note the cost you develop is used to calculate cost of goods sold and to value inventory, accuracy is imperative.
Product costing is a tedious and involved process. This project will afford you at least a rudimentary knowledge if you should be employed as a cost accountant.
Material Cost File
Part NumberUnit Cost
A2.35
A3.40
B2.20
B3.30
C2.15
C3.25
Labor rate per hour is $15.00.
Assembly time from industrial engineering is .012 hours per assembly.
Factory overhead rate is 150% of labor cost.
Widget-Product Structure
LevelSourceQuantityPart NumberMaterialLaborOverheadTotal
0M1 01
1M1A1
2P1A2
2P1A3
1M1B1
2P 1B2
2P2B3
1M1C1
2P1C2
2P2C3
Please cost the Widget above. Use the material cost file for material cost, assembly time from industrial engineering for assembly and the overhead rated determined from the budgeting process. Please pay attention to the quantity column.
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started