Answered step by step
Verified Expert Solution
Question
1 Approved Answer
According to standard production costs, it should cost JT Engineering $14,000 in direct materials, $12,600 in direct labor, and $6,200 in total overhead to produce
According to standard production costs, it should cost JT Engineering $14,000 in direct materials, $12,600 in direct labor, and $6,200 in total overhead to produce 1,000 widgets. During the most recent period, JT actually spent $13,860 in direct materials, $12,420 in direct labor, and $6,500 in total overhead. What is JTs total variance? Is it favorable or unfavorable?
A : $20 favorable
B : $32 unfavorable
C : $180 favorable
D : $40 unfavorable
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started