Activity Description Duration Predecessor
A Design 9
B Procure prototype parts 5 A
C Fabricate parts 6 A
D Assemble prototype 6 B, C
E Laboratory test 9 D
F Field test 8 E
G Adjust design 11 F
H Order stock components 5 G
I Order custom components 10 G
J Assemble test production unit 9 H, I
K Test unit 8 J
L Document results 2 K

Part C. Management is not happy with the schedule and wants the project completed as soon as possible. Unfortunately, they are not willing to approve additional resources. One team member pointed out that the network contained only finish-to-start relationships and that it might be possible to reduce project duration by creating start-to-start lags. After much deliberation the team concluded that the following relationships could be converted into start-to-start lags:

  • Procure prototype parts could start 8 days after the start of Design.
  • Fabricate parts could start 8 days after the start of Design.
  • Laboratory test could begin 2 day(s) after the start of Assemble prototype.
  • Field test could start 3 days after the start of Laboratory test.
  • Adjust design could begin 4 days after the start of Field test.
  • Order stock and Order custom components could begin 3 days and 4 days, respectively, after Adjust design.
  • Test unit could begin 7 days after the start of Assemble test production unit.
  • Document results could start 3 days after the start of Test unit.

Reconfigure the CyClon schedule by entering all nine start-to-start lags.

what is the ES for activity D?

what is the LF for activity H?

what is the slak for acitivy C?

what is the slack for activy H?

what is the slack for activity I?

what is the length of the project?

what is the critical path?

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Enterprise

Authors: William B. Gartner; Marlene G. Bellamy

1st edition

978-0324130850, 324130856, 978-0324786552

More Books

Students also viewed these General Management questions

Question

What type of computer memory does C: usually refer to?

Answered: 1 week ago

Question

What is the purpose of a firewall?

Answered: 1 week ago

Question

What is the difference between a CPU and a GPU?

Answered: 1 week ago

Question

What are the various principles of material handling ?

Answered: 1 week ago