Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

ACTIVITY DURATION, COSTS AND RESOURCE REQUIREMENTS: From a more detailed analysis of the project activities, you have been able to estimate e duration, costs and

image text in transcribed
ACTIVITY DURATION, COSTS AND RESOURCE REQUIREMENTS: From a more detailed analysis of the project activities, you have been able to estimate e duration, costs and resource requirements ned with various activities related to the project. The information obtained from the detailed analyses is given in Table 1 below TABLE 1: SUMMARY OF INFORMATION OBTAINED FROM DETAILED ANALYSIS Normandie Die Det er THE PROJECT SCENARIO: Suppose you have been assigned as the project manager for a project which your company has only on through a competitive bidding. The client wants to build a manufacturing plant Aher analysing the project activities and discussing with various supervisors, you have been able to identity the following task relationships The project starts with the excavation for the foundations The foundation for the building can only be laid once the foundation excavion has been finished The rough wall can be placed only after the foundation has been taid The placement of roof requires the completion of rough wall works. The start of the exterior plumbing work is dependent on the completion of rough wal war Interior plumbing cannot start until the exterior plumbing is complete Exterior siding cannot start until the roof is in place The start of exterior painting requires the completion of the exterior siding and the entorplumbing works The electrical work can start once the rough wall is in place Wal bound can be placed only after the interior plumbing and electrical works are complete Flooring and interior painting Cannot start until the walboard work is complete Exterior dures can be installed only after the completion of the exterior painting work Interior futures cannot be placed und flooring and interior painting are complete Installation of interior fixture makes the project ready for handover. A 200.000 3 Lay the nation 320,000 3 24 CPU I will 10 D PI E 450.000 3 all the coming In the interpong F 7 5.X 7.X Putup the 4. 5 3 H Do the orig 5+ 3 1 TEX De theo 450.000 5 4 4 350.000 3 3. 1 Dohop To 1 1 SIL . X. you dpt your need PROJECT INDRECT COSTA ACTIVITY DURATION, COSTS AND RESOURCE REQUIREMENTS: From a more detailed analysis of the project activities, you have been able to estimate e duration, costs and resource requirements ned with various activities related to the project. The information obtained from the detailed analyses is given in Table 1 below TABLE 1: SUMMARY OF INFORMATION OBTAINED FROM DETAILED ANALYSIS Normandie Die Det er THE PROJECT SCENARIO: Suppose you have been assigned as the project manager for a project which your company has only on through a competitive bidding. The client wants to build a manufacturing plant Aher analysing the project activities and discussing with various supervisors, you have been able to identity the following task relationships The project starts with the excavation for the foundations The foundation for the building can only be laid once the foundation excavion has been finished The rough wall can be placed only after the foundation has been taid The placement of roof requires the completion of rough wall works. The start of the exterior plumbing work is dependent on the completion of rough wal war Interior plumbing cannot start until the exterior plumbing is complete Exterior siding cannot start until the roof is in place The start of exterior painting requires the completion of the exterior siding and the entorplumbing works The electrical work can start once the rough wall is in place Wal bound can be placed only after the interior plumbing and electrical works are complete Flooring and interior painting Cannot start until the walboard work is complete Exterior dures can be installed only after the completion of the exterior painting work Interior futures cannot be placed und flooring and interior painting are complete Installation of interior fixture makes the project ready for handover. A 200.000 3 Lay the nation 320,000 3 24 CPU I will 10 D PI E 450.000 3 all the coming In the interpong F 7 5.X 7.X Putup the 4. 5 3 H Do the orig 5+ 3 1 TEX De theo 450.000 5 4 4 350.000 3 3. 1 Dohop To 1 1 SIL . X. you dpt your need PROJECT INDRECT COSTA

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

The Customer Satisfaction Audit

Authors: Abram I Bluestein, Michael Moriarty, Ronald J Sanderson

1st Edition

190243398X, 978-1902433981

More Books

Students also viewed these Accounting questions

Question

=+b. Is the population distribution symmetric or skewed?

Answered: 1 week ago

Question

Make efficient use of your practice time?

Answered: 1 week ago