Question
Activity7:Inspect,repairandalterscaffoldingupto4metres. Thisactivityrequiresyoutoerectanddismantleonemodularscaffoldingsystemuptofourmetres, including three bays (one with a return), one lift with ladder, and fall and edge protection. Thisactivitymustbecompletedinaccordancewiththefollowing: JSAs SWMSs Jurisdictional requirements relating to
Activity7:Inspect,repairandalterscaffoldingupto4metres.
Thisactivityrequiresyoutoerectanddismantleonemodularscaffoldingsystemuptofourmetres, including three bays (one with a return), one lift with ladder, and fall and edge protection.
Thisactivitymustbecompletedinaccordancewiththefollowing:
- JSAs
- SWMSs
- Jurisdictional requirements relating to erecting and dismantling a modular scaffolding system up to 4 metres
Tocompletethisactivity,youarerequiredto:
- Completethestepsgiveninthe'Checklist4'provided.
- ComplywithWHS/OHSrequirements.
- WearPPEappropriateforthejob.
Checklist4:Inspect,repairandalterscaffoldingupto4metres.
Steps | Tickmark,when completed |
Step1:Inspectcriticalstructuralandsafetyareasofscaffoldingfordamage, corrosion and wear. Instructions:
Further,documenttheinspectionsconductedusingTemplate4. | v |
Step 2:Check current use of scaffolding for compliance with type of scaffolding equipment. Instructions:
Further,documentthefollowingusingTemplate4.
| v |
Step3:Reviewscaffoldingtodetermineifchangesormodificationswere scheduled as per original planning. Instructions:
Further,documenttheproceduresyouimplementedtoreviewscaffoldingto determineifchangesormodificationswerescheduledasperoriginalplanningusing Template4. | v |
Step4:Carryoutalterationsorrepairs. Instructions:
orrepairs.
Further,documenttheproceduresyouimplementedtocarryoutalterationsor repairs using Template 4. | v |
Step5:Completeinspectionlogandhandover. | v |
Sign off:J Date:20/10/2022 |
Template4:Inspect,repairandalterscaffoldingupto4metres
Inspect,repairandalterscaffoldingupto4metres | |
Client Name:STC Address:16 Lotus St, Woolloongabba QLD 4102 Phone Number:07)3891 3282 Date(dd/mm/yyyy) Worker name: Jun-woo Han | JobDetails: Inspect,repairandalterscaffoldingupto4metres Worker signature: Jun-woo Han |
Inspectionsconducted | |
| |
Procedures followed to review scaffolding todetermine if changes or modifications werescheduled as per original planning. |
Proceduresimplementedtocarryoutalterationsorrepairs. |
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started