Answered step by step
Verified Expert Solution
Link Copied!

Question

00
1 Approved Answer

Activity-Based Costing: Factory Overhead Costs The total factory overhead for Bardot Marine Company is budgeted for the year at $1,293,950, divided into four activities: fabrication,

image text in transcribed
Activity-Based Costing: Factory Overhead Costs The total factory overhead for Bardot Marine Company is budgeted for the year at $1,293,950, divided into four activities: fabrication, $682,000; assembly, $288,000; setup, $176,700; and inspection, $147,250. Bardot Marine manufactures two types of boats: speed boats and bass boats. The activity-base usage quantities for each product by each activity are as follows: Fabrication Assembly Setup Inspection Speedboat 7,750 din 24,000 dih 56 setups 97 inspections Bass boat 23,250 8,000 409 678 31,000 dih 32,000 din 465 setups 775 Inspections Each product is budgeted for 4,000 units of production for the year a. Determine the activity rates for each activity. Fabrication per direct labor hour Assembly per direct labor hour Setup per setup Inspection per inspection b. Determine the activity based factory overhead per unit for each product. Round to the nearest whole dollar Speedboat per unit Bass boat per unit

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access with AI-Powered Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Students also viewed these Accounting questions