After a significant redesign of the control station, the safety engineers have requested the unit be re-tested. However, the test budget has been reduced in
After a significant redesign of the control station, the safety engineers have requested the unit be re-tested. However, the test budget has been reduced in the past year. If the safety engineers reduced the test hours to 800 and want to ensure a failure rate () of less than 0.02 with 97.5% confidence, what is the maximum number of failures you can experience during the testing?