Answered step by step
Verified Expert Solution
Question
1 Approved Answer
After graduation from METU you will start working as an operations manager at an electronics manufacturer that faces assembly-line balancing problems. You have been
After graduation from METU you will start working as an operations manager at an electronics manufacturer that faces assembly-line balancing problems. You have been told that the firm needs to complete 4,200 units per month. Assume that there are 20 working days in one month and there are 8 working hours in a day however every working day the line has to stop 1 hour during lunch time. Task Length (minutes) Immediate Predecessor a 0.2 b 0.4 0.3 1.3 C d e f g h 0.1 0.8 0.3 1.2 a - b, c e d, f g a. Find the cycle time. b. Draw a diagram that shows precedence relationships of the tasks. c. Find the theoretical minimum number of workstations. d. Assign tasks to workstations using the Ranked Positional Weight Algorithm. e. Evaluate the optimality of the solution you found in part d in terms of number of workstations.
Step by Step Solution
★★★★★
3.36 Rating (159 Votes )
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started