Indicate the necesar best completes termalmente Adem Muketing manufacts to products, and the company serieplantide for even goede went is considering moving to multiple department stomfie allocating over DLP 3 A 10000 Pengt Pinting Dept 2. 125.000 16 21 2000 II. Calculate the plastide fury overheat rate fier Adirondack Marketing $25.00 h 5007 4.594.77 perih d. 5 perdh 12. Calculate the overhead rute per unit for Product in the pering dipament of Adirondack Marketing love L $236.2 permit $325.00 4.5147.70 per 5161.00 per 13. in dople purtant factory overheating of dectory vede ultimo product.com bwi di produtos is simple desi pensie to compete the duppliesova costa departually Che following infomation, dete the activity for Act Bad A 10 Activity Pool Beta spection Asembly (DU) 2.598.00 b. SIKDO 6. S. STORE 512000 SDOOR Indicate the answer choice that best completes the statement or answers the question. Adirondak Marketing Inc. manufactures two products, A and B. Presently, the company uses a single plantwide factory overhead rate for allocating overhead to products. However, management is considering moving to a multiple department rate system for allocating overhead. Total DLH per Product Direct Overhead Labor Hours B Painting Dept. $250,000 10,000 Finishing Dept. 75.000 12.000 16 Totals $325,000 22,000 20 16 4981 1815 11. Calculate the plantwide factory overhead rate for Adirondack Marketing Inc. a. $25.00 per dlh b. 50.07 per dih c. $14.77 per dih d. $ 6.25 per dih 12. Calculate the overhead rate per unit for Product A in the painting department of Adirondack Marketing Inc. a. $236.32 per unit b. $325.00 per unit c. $147.70 per unit d. $161.00 per unit 13. Using multiple department factory overhead instead of a single plantwide factory overhead rate: a. results in more accurate product costs b. results in distorted product costs c. is simpler and less expensive to compute than a plantwide rate d. applies overhead costs to all departments equally 14. Given the following information, determine the activity rate for setups, Activity Base Activity Pool Setups Inspections Assembly (DLH) a. $58.00 b. S18.00 c. S.75 d. $5.09 10,000 24,000 80,000 Budgeted Amount $180,000 $120,000 $400,000