Question
Allocate overhead using a single plantwide rate, multiple department rates, and activity-based costing Downhill Sports Inc. manufactures two products: snowboards and skis. The factory overhead
Allocate overhead using a single plantwide rate, multiple department rates, and activity-based costing
Downhill Sports Inc. manufactures two products: snowboards and skis. The factory overhead incurred is as follows:
Line Item Description | Amount |
---|---|
Indirect labor | $360,000 |
Cutting Department | 250,000 |
Finishing Department | 560,000 |
Total | $1,170,000 |
The activity base associated with the two production departments is direct labor hours. The indirect labor can be assigned to two different activities as follows:
Activity | Budgeted Activity Cost | Activity Base |
---|---|---|
Production control | $90,000 | Number of production runs |
Materials handling | 270,000 | Number of moves |
Total | $360,000 |
The activity-base usage quantities and units produced for the two products follow:
Line Item Description | Number of Production Runs | Number of Moves | Direct Labor Hours-Cutting | Direct Labor Hours-Finishing | Units Produced |
---|---|---|---|---|---|
Snowboards | 450 | 5,000 | 2,000 | 4,000 | 5,000 |
Skis | 50 | 2,500 | 3,000 | 3,000 | 5,000 |
Total | 500 | 7,500 | 5,000 | 7,000 | 10,000 |
Required:
1. Determine a single plantwide factory overhead rate based upon direct labor hours. FILL IN THE BLANK Direct labor overhead rate: $ per direct labor hour
2. Determine the total and per-unit factory overhead costs allocated to each product, using the plantwide overhead rate in (1). Round per unit amounts to the nearest whole cent.
Product | Total Factory Overhead | Factory Overhead Per Unit |
---|---|---|
Snowboards | $fill in the blank 2 | $fill in the blank 3 |
Skis | $fill in the blank 4 | $fill in the blank 5 |
3. Determine the factory overhead rates under the multiple production department rate method. Assume that indirect labor is associated with the production departments, so that the total factory overhead is $435,000 and $735,000 for the Cutting and Finishing departments, respectively. Round per unit amounts to the nearest whole cent.
Department | Production Department Rate |
---|---|
Cutting Department | $fill in the blank 6 per direct labor hour |
Finishing Department | $fill in the blank 7 per direct labor hour |
4. Determine the total and per-unit factory overhead costs allocated to each product, using the multiple production department overhead rates in (3). Round per unit amounts to the nearest whole cent.
Product | Total Factory Overhead | Factory Overhead Per Unit |
---|---|---|
Snowboards | $fill in the blank 8 | $fill in the blank 9 |
Skis | $fill in the blank 10 | $fill in the blank 11 |
5. Determine the activity rates, assuming that the indirect labor is associated with activities rather than with the production departments. Round per unit amounts to the nearest whole cent.
Activity | Activity Rate |
---|---|
Production Control | $fill in the blank 12 per prod. run |
Materials Handling | $fill in the blank 13 per move |
Cutting Department | $fill in the blank 14 per dlh |
Finishing Department | $fill in the blank 15 per dlh |
6. Determine the total and per-unit cost assigned to each product under activity-based costing. Round the per unit amounts to the nearest whole cent.
Product | Total Activity Cost | Activity Cost Per Unit |
---|---|---|
Snowboards | $fill in the blank 16 | $fill in the blank 17 |
Skis | $fill in the blank 18 | $fill in the blank 19 |
7. Comment on the differences in the per-unit overhead allocated to each product using the single plantwide factory overhead rate method, the multiple production department factory overhead rate method, and activity-based costing. The plantwide overhead method allocates $ of overhead to each product, while the multiple production department method allocates $ overhead to snowboards and $ to skis. Both the plantwide and multiple production department methods distort the allocation of overhead because they account for how each product consumes overhead. In contrast, activity-based costing allocates $ of factory overhead to snowboards and $ skis. Activity-based costing accurately allocates factory overhead because for how each product consumes overhead. Snowboards consume direct labor hours in the Finishing Department, which has overhead. In addition, snowboards consume production control and materials handling overhead than do skis. This is because snowboards are made in lots, representing a variety of styles. Thus, snowboards have activity costs than skis
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started