Question

1 Approved Answer

An airport authority intends to build a bridge to connect two sections of the airport. Option A is a high-level reinforced concrete bridge that connects

image text in transcribed
An airport authority intends to build a bridge to connect two sections of the airport. Option A is a high-level reinforced concrete bridge that connects directly into the highway going into the city but is environmentally intrusive to construct. The second option is a low-level steel bridge that is less environmentally invasive, but does not connect into the city's highway network. The concrete bridge has an initial construction cost of $40 million, with annual maintenance costs of $20,000. The asphalt road surface has to be overlaid every 9 years at a cost of $75,000. The steel bridge is estimated to cost $35 million to construct with annual maintenance costs of $15,000. The steel frame must be painted every 4 years (approximately $220,000 in costs) and its road pavement must be resurfaced every 9 years at a cost of $45,000 per resurfacing. Compare the two options based on capitalized cost, assuming a discount rate of 5% and infinite service life. Which option is preferred? [10 pts]

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Risk Management In Organizations An Integrated Case Study Approach

Authors: Margaret Woods

1st Edition

0415591732, 9780415591737

More Books

Students also viewed these Accounting questions