An assembly line with 25 operations is to be balanced. The total amount of time required for all operations is 59 minutes. The longest operation
An assembly line with 25 operations is to be balanced. The total amount of time required for all operations is 59 minutes. The longest operation takes 1.9 minutes and the shortest takes 0.8 minutes. The line will operate for 570 minutes per day. What is the output rate if the cycle time is set at 1.9 minutes? Round the output rate to the closest whole number
An assembly line with 25 operations is to be balanced. The total amount of time required for all operations is 59 minutes. The longest operation takes 1.9 minutes and the shortest takes 0.8 minutes. The line will operate for 570 minutes per day. What is the output rate if the cycle time is set at 1.9 minutes? Round the output rat to the closest whole number. Your Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started