an electric utility is considering a new power plant in northern arizona
An electric utility is considering a new power plant in northern Arizona, Power from the plant would be sold in the Phoenix area, where it is badly needed. Because the firm has received a permit, the plant would be legal; but it would cause some air pollution. The company could spend an additional 540 milion at Year o to mitigate the environmental problem, but it would not be required to do so. The plant without mitigation would cost $239.67 milion, and the expected cash inflows would be $80 milion per year for 5 years. If the firm does invest in mitigation, the annual inflows would be $84.66 million. Unemployment in the area where the plant would be built is high, and the plant would provide about 350 good jobs. The risk adjusted WACC is 19% a. Calculate the NPV and IRR with mitigation, Enter your answer for NPV in millions. For example, an answer of 510,550,000 should be entered as 10.55. Negative values, f any, should be indicated by a minus sign. Do not round intermediate calculations. Round your answers to two decimal places. NPV: 5 milion IRR: % Calculate the NPV and IRR without mitigation. Enter your answer for NPV in millions. For example, an answer of $10,550,000 should be entered as 10.55. Negative values, any, should be indicated by a mnus sign. Do not round intermediate calculations. Round your answers to two decimal places. NPV: 5 milion TRR: b. How should the environmental effects be dealt with when evaluating this project? 1. The environmental effects if not mitigated would result in additional cash flows. Therefore, since the plant is legal without mitigation, there are no benefits to performing a "no mitigation analysis II. The environmental effects should be ignored since the plant is legal without mitigation II. The environmental effects should be treated as a sunk cost and therefore ignored. IV. Y the utility mitigates for the environmental effects, the project is not acceptable. However, before the company chooses to do the project without mitigation, it needs to make sure that any costs of all wil" for not mitigating for the environmental effects have been considered in the original analysis. V. The environmental effects should be treated as a remote possibility and should only be considered at the time in which they actually occut. 96 -Select c. Should this project be undertaken? 1. Even when no mitigation is considered the project has a negative NPV, so it should not be undertaken. II. The project should be undertaken only if they do not mitigate for the environmental effects. However, they want to make sure that they've done the analysis properly due to any ill will and additional "costs that might result from undertaking the project without concem for the environmental impacts. III. The project should be undertaken only under the 'mitigation assumption IV. The project should be undertaken since the IRR is positive under both the "mitigation" and "no mitigation" assumptions. V. The project should be undertaken since the NPV is positive under both the "mitigation" and "no mitigation" assumptions Activate Windows Go to Settings to activate W -Select