Answered step by step
Verified Expert Solution
Link Copied!

Question

00
1 Approved Answer

An electric utility is considering a new power plant in northern Arizona. Power from the plant would be sold in the Phoenix area, where it

An electric utility is considering a new power plant in northern Arizona. Power from the plant would be sold in the Phoenix area, where it is badly needed. Because the firm has received a permit, the plant would be legal; but it would cause some air pollution. The company could spend an additional $40 million at Year 0 to mitigate the environmental problem, but it would not be required to do so. The plant without mitigation would require an initial outlay of $209.99 million, and the expected cash inflows would be $70 million per year for 5 years. If the firm does invest in mitigation, the annual inflows would be $75.89 million. Unemployment in the area where the plant would be built is high, and the plant would provide about 350 good jobs. The risk adjusted WACC is 19%.

a) Calculate the NPV and IRR with and without mitigation. Enter your answer for NPV in millions.

b) How should the environmental effects be dealt with when evaluating this project?

  1. The environmental effects should be treated as a sunk cost and therefore ignored.
  2. If the utility mitigates for the environmental effects, the project is not acceptable. However, before the company chooses to do the project without mitigation, it needs to make sure that any costs of "ill will" for not mitigating for the environmental effects have been considered in the original analysis.
  3. The environmental effects should be treated as a remote possibility and should only be considered at the time in which they actually occur.
  4. The environmental effects if not mitigated would result in additional cash flows. Therefore, since the plant is legal without mitigation, there are no benefits to performing a "no mitigation" analysis.
  5. The environmental effects should be ignored since the plant is legal without mitigation.

c) Should this project be undertaken?

  1. The project should be undertaken since the NPV is positive under both the "mitigation" and "no mitigation" assumptions.
  2. Even when no mitigation is considered the project has a negative NPV, so it should not be undertaken.
  3. The project should be undertaken only if they do not mitigate for the environmental effects. However, they have to make sure that they've done the analysis properly to avoid any "ill will" and additional "costs" that might result from undertaking the project without concern for the environmental impacts.
  4. The project should be undertaken only under the "mitigation" assumption.
  5. The project should be undertaken since the IRR is positive under both the "mitigation" and "no mitigation" assumptions.

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access with AI-Powered Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Frank Woods Business Accounting Volume 1

Authors: Alan Sangster, Frank Wood

13th Edition

9781292084664

Students also viewed these Finance questions