An existing building on the land was torn down to allow construction of a new building on the land. The cost of the demolition was
An existing building on the land was torn down to allow construction of a new building on the land. The cost of the demolition was capitalized as part of the cost of the new building.propose an adjusting entry or not? if yes what entry it will be and why?