Andrew, Brian and Elizabeth were the directors of First Fleet Village Pty . Ltd . First Fleet is a residential property development, which has

Andrew, Brian and Elizabeth were the directors of First Fleet Village Pty. Ltd. 

First Fleet is a residential property development, which has reclaimed an area of swampland and disused industrial land. It has had the land rezoned and subdivided and built prestigious waterfront houses.

The directors were aware of certain remaining toxicity levels in the soil of the development but were of the view that this shouldnt be a big problem, as after dumping a metre of soil everywhere, plants grew. Andrew is a scientist who has worked on some big water management projects overseas and performed the necessary checks, although he hasnt had much to do with soils, land reclamation, industrial sites or swamps.

Due to the large amount of capital that the company has spent on the development, the directors were keen to sell the houses quickly. They developed standard form contracts which were available on the day at bargain prices, on a first come, first served, no negotiation basis.

The homes were a big success, and all were sold within 2 weeks. The company is now developing a neighbouring site in the same way.

Dave and Angie run a coffee shop and bought one of the new homes as their first home. It cost them $500,000 plus stamp duty. They looked at the contract only briefly and did not seek legal advice  First Fleet werent negotiating, and the homes were selling like hotcakes, so as Elizabeth told them, take it or leave it  if you dont buy then the next person through the door will  the property market is running hot!

After six months Dave and Angie decided to do a bit of landscaping, but the soil seemed bad, and the plants started to die. They consulted a gardener who said the soil was the problem. He advised them that there is a big problem with acid sulphate soils in a lot of these swampy areas. Apparently, this is a naturally occurring phenomenon, but when the soils are drained, excavated or exposed to air, the sulphides react with oxygen to form sulphuric acid. This can then release heavy metals such as arsenic. As well as killing vegetation, this can also degrade concrete and steel structures.

Dave and Angie were horrified. They consult an expert in the field and discover that only one metre of soil was used to cover the site, whereas at least 3 metres is normally required. Also, time is needed for soil to recover, and it is unheard of to build on land within 3 years of reclamation, and normally takes 5 years before the land can be built upon. First Fleet gave the land just 6 months between dumping soil and commencing to build.

There already cracks appearing in their house, and Dave and Angie are afraid to let their little girl go outside to play. She hasnt been well, and they are worried whether this may be due to exposure to arsenic in the soil.

Dave and Angie, together with some of their neighbours who are experiencing similar problems, are seeking legal advice. Their solicitor has contacted First Fleet as a first step toward legal action.

You have been contacted by Brian, on behalf of the directors of First Fleet Pty Ltd.  They would like you to advise them as to any potential liability or actions under the law, including contract law, consumer law, property law and the law of tort, arising because of the information in the First Fleet case study.

Ensure that relevant case law and statutes/regulations are mentioned in your advice.

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access with AI-Powered Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Students also viewed these Law questions