Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

As a process design engineer, you have been requested to give your professional advice on this brownfield redesign project. An ore is ground from a

As a process design engineer, you have been requested to give your professional advice on this brownfield redesign project. An ore is ground from a crushed product such that 80% passes a 500-micron sieve down to a size in which 80% passes an 88-micron sieve. A 5hp motor is sufficient for the required throughput and for grinding. If the requirements are changed such that grinding is now to be done to 80% passing a 125-micron sieve, but the throughput is to be increased by 50%, is the existing motor sufficient to operate the mill? Assume Bonds equation applies.

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image_2

Step: 3

blur-text-image_3

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Introduction To Chemical Engineering

Authors: S. Pushpavanam

1st Edition

8120345770, 978-8120345775

More Books

Students also viewed these Chemical Engineering questions