As a resource manager of the Delta Sound project, you are preparing the material requirement plan (MRP) for a product S (subassembly) for the next
As a resource manager of the Delta Sound project, you are preparing the material requirement plan (MRP) for a product S (subassembly) for the next 8 weeks. The demand for the subassembly S is 100 units in week 6, and 100 units in week 7. Each unit of S requires 1 unit of T, and 2 units of U. Each unit of T requires 1 unit of V, and 2 units of W. Finally, each unit of U requires 2 units of Y, and 3 units of Z. One firm manufactures all items. It takes 1 weeks to make S, 1 week to make T, 2 weeks to make U, 2 weeks to make V, 3 weeks to make W, 1 weeks to make Y, and 0 week to make Z.
- Develop a product structure (Bill of Material). Identify all levels, parents and components.
- Construct a 'Material requirements plan (MRP)' by using the following on-hand inventory, quantity multiple, and safety stock provision exhibiting in Table 1:
Item | On-hand inventory | Quantity multiple | Safety Stock | Schedule receive |
S | 20 | Lot for lot | 0 | |
T | 20 | Lot for lot | 0 | |
U | 40 | 50 | 0 | 50 in week 2 |
V | 30 | Lot for lot | 10 | |
W | 30 | 15 | 0 | |
Y | 140 | 200 | 20 | 100 in week 1 |
Z | 40 | Lot for lot | 0 |
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started