As of November 2019, Tom served as the design and execution engineer at PAIBEAM Company, responsible for designing a 6-story residential building. The architectural design

As of November 2019, Tom served as the design and execution engineer at PAIBEAM Company, responsible for designing a 6-story residential building. The architectural design included five residential floors and one pilot floor for parking. Based on geotechnical laboratory reports indicating a Type 2 soil, I opted for a medium reinforced concrete frame structure (in both X and Y directions) considering the owner's and contractor's requirements for economic optimization.

Given constraints in ceiling spans, column spacing, and cost-effectiveness, I proposed and finalized a ribbed slab system. For structural design, I utilized ETABS and SAFE software, while AutoCAD was employed for detailed structural drawings. Considering the seismicity of Tehran city, I designed the lateral earthquake loads per the ASCE-7 American standard and ASCE-7 2800 for building seismic design. For dead and live loads, I followed the sixth chapter of the national building regulations and the ninth chapter for the design and control of reinforced concrete structures, adhering to ACI-318 American concrete standards.

Actions taken in this project as a structural designer include:

1. Reviewing the project's planning form from Tehran Municipality, examining its regulations and constraints.
2. Dimensioning and finalizing columns, coordinating with the architectural department, and aligning with owner and contractor requirements.
3. Thoroughly studying the geotechnical laboratory report, examining borehole logs for groundwater and soil properties.
4. Controlling the joint openings on the architectural plan and ensuring compliance with seismic regulations, considering the building's height.
5. Calculating the joint opening based on the formula 0.005xH = ∆, as the building was less than 8 stories and did not fall under tall building regulations.
6. Modeling the structure in ETABS based on architectural plans and sections, selecting an appropriate structural system, and opting for a linear static analysis method for the building, choosing a medium reinforced concrete frame structure in both X and Y directions.

Please complete the following according to the text above

COMPETENCY CATEGORY 3: PROJECT AND FINANCIAL MANAGEMENT

 

3.1 AWARENESS OF PROJECT MANAGEMENT PRINCIPLES.

1: SITUATION (MAX. 300 :

 

2: ACTION TAKEN (MAX. 1,650 ):

 

3: OUTCOME (MAX. 300 ):

 

3.2 DEMONSTRATE INCREASING LEVELS OF RESPONSIBILITY FOR PROJECT PLANNING AND IMPLEMENTATION.

 

1: SITUATION (MAX. 300 ):

 

2:ACTION TAKEN (MAX. 1,650 ):

 

3:OUTCOME (MAX. 300 :

 

3.3 MANAGE EXPECTATIONS IN LIGHT OF AVAILABLE RESOURCES.

 

1:SITUATION (MAX. 300 :

 

2:ACTION TAKEN (MAX. 1,650 ):

 

3:OUTCOME (MAX. 300 ):

 

3.4 UNDERSTAND THE FINANCIAL ASPECTS OF THEIR WORK.

 

1:SITUATION (MAX. 300 ):

 

2:ACTION TAKEN (MAX. 1,650 ):

 

3:OUTCOME (MAX. 300 ):

 

3.5 ASK FOR AND DEMONSTRATE RESPONSE TO FEEDBACK.

 

1:SITUATION (MAX. 300 :

 

2:ACTION TAKEN (MAX. 1,650 ):

 

3:OUTCOME (MAX. 300 :


Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Project management the managerial process

Authors: Eric W Larson, Clifford F. Gray

5th edition

73403342, 978-0073403342

More Books

Students also viewed these Civil Engineering questions

Question

How are the work breakdown structure and change control connected?

Answered: 1 week ago

Question

Describe the major components of the strategic management process.

Answered: 1 week ago

Question

7. How does caffeine increase arousal?

Answered: 1 week ago

Question

3. During which part of a nights sleep is REM most common?

Answered: 1 week ago