As of the end of June, the job cost sheets at Racing Wheels Inc, show the following total costs accumulated on three customjobs. Check my Job 13 Direct materials Direct labor Overhead applied Job 102 $25,000 15.000 4, noe $69.000 20.000 8.96 Job 104 $61,000 43,000 1.760 Job 102 was started in production in May, and the following costs were assigned to itin Mby direct meterials. 58.000, direct labor $3.500, and overhead, S1152. Jobs 103 and 104 were started in June. Overheed cost is applied with a predetermined rate based on direct labor cost Jobs 102 and 103 were finished in June, and Job 104 is expected to be finished in July No raw materiais were used indirectly in June. Using this information answer the following questions. Assume this company's predetermined overhead rate did not change across these months) 182. Complete the table below to calculate the cost of the raw materials requis tioned and direct labor cost incurred during June for 3. Using the accumulated costs of the jobs what predetermined overheed rate is used? 4. How much total cost is transferred to finished goods during June? Complete this question by entering your answers in the tabs below. Reg 1 and 2 Reg 3 Red Complete the table below to calculate the cost of the raw materials requisitioned and direct labor cost incurred during June for each of the three jobs Reg 1 and 2 Reg 3 Reg 4 Complete the table below to calculate the cost of the raw materials requisitioned and direct labor cost incurred during June for each of the three jobs. Direct Materials Job May June Total 102 103 104 Total Direct Labor June Total Job May 102 103 104 Total Reg 3 > Req 1 and 2 Req 3 Req 4 Using the accumulated costs of the jobs, what predetermined overhead rate is used? Overhead Rate Choose Numerator: Choose Denominator: Overhead Rate Job 102 / Overhead rate Job 103 Overhead rate 1 Job 104 1 Overhead rate Complete this question by entering your answers in the tabs below. Req 1 and 2 Req 3 Req 4 How much total cost is transferred to finished goods during June? Job Direct Materials Direct Labor Applied Overhead Total Cost Cost Transferred to Finished Goods 102 $ 28,000 $ 15 000 103 69,000 28,000 104 61,000 43,000 Total $ 86,000