Question
As part of a major plant renovation project, the industrial engineering department has been asked to balance a revised assembly operation to achieve an output
As part of a major plant renovation project, the industrial engineering department has been asked to balance a revised assembly operation to achieve an output of 250 units per 7-hour day. Task times and precedence relationships are as follows:
Do each of the following:
a. Draw the precedence diagram.
b. Determine the minimum cycle time, the maximum cycle time, and the calculated cycle time.
c. Determine the minimum number of stations needed.
d. Using the calculated cycle time, assign tasks to workstations on the basis of most following tasks. Use shortest processing time as a tiebreaker. Indicate the workstations on the precedence diagram.
e. Compute the percent efficiency and percent idle time for the assignment in part D. Note: if the calculated cycle time and the actual bottleneck station time are different, use the actual bottleneck time in your calculations
Task Duration (minutes) Immediate Predecessor abcdefg0.50.40.20.41.41.31.4abdce,fStep by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started